This is for when the radio is broken..

This is for when the radio is broken and crackles like uranium orchids
This is for when the fรถhn-wind rattles the telegraph wires like a handful of bones
This is for when dream ambulances skitter through the streets at midnight
This is for when you get caught in a sleep-riot and the sky is out of order
This is for when your sex is full of voodoo
This is for when your clothes are imaginary
This is for when your flesh creeps and never comes back.

Things are quiet here, not trapped and dead under a roof collapse deep in a mine, just not much exploring going on. There has however been lots of research, chasing down leads and lifting lids so to speak so hopefully there’ll be something of interest for you soon…
In the meantime here’s some random stuff found laying round on one of the hard disks that I don’t think has seen the light of day.

P.S Hi to the readers in far flung places like Latvia, Russia, Iran, Australia, Canada and the USA….thanks for reading !!

Oh Me Oh My There’s A Light In The Sky

Don’t you just love an unplanned Bonus-Up?This one kind of fell into my lap the other night when I got an unexpected opportunity to kill two birds with one stone: A) Top a Water Tower.
B)
Get up close and personal with monster green lasers that were flying around the night sky.


No Photoshop wizardry here and no taking the red pill, staying in Wonderland and seeing how deep the rabbit-hole goes,
this shit really happened.

The two beams in shot six are coming from 5 miles away and form a 5 mile x 5.2 mile x 2.2 mile triangle. A total of six 7.8w lasers were being used.

This pair of towers were built around 1975 and are 35m high, the fat one that I topped holds 3.41 million litres and its skinnier neighbour holds 1.14 million litres.

As usual the clock was ticking and it was pitch black but I did manage to crack off the following shots…


Wrong Way Down
Heart of the machine
5 miles out
This Is Earth Calling
Lasers set to stun

Mines #45 – Arch Rivals

We’ve been hitting this place up for six months now and despite making great progress elsewhere in the mine these pesky arches have been just out of my reach for ages. First time I tried to reach them there was around eight feet of water and they just sat there in the distance teasing me (Picture 1 below), then a few months later the water level had dropped four feet and I was able to get quite close but had to abandon when water was lapping at the top of my tripod (Pic 2 below).

We’ve not been here for a while but on last weekends visit we were amazed to see the water level had dropped totally by the arches and we could walk right past them into virgin territory.

Now we could get down there we shocked as to their purpose…..the mine ceiling was supported on massive wooden cogs built on top of the arches and was at least 8-10 feet above the now buckling steelwork!

If you look at the third shot below you can make out the first two cogs above the steelwork.

Apologies for no more photo’s from this trip, the rest of the day was spent negotiating truly giant, unstable roof falls and getting stuck in three foot deep mud in a very low heading way out in the west. We did find several more Plant Rooms and some curious ‘dams’ that I need to find out more about…

May
June

September

 

 

Too Orangey For Crows

This one has been on the To-Do list for ages, so long in fact that someone else beat us too it, c’est la vie!, you win some, lose some…

The truth is we were elsewhere frying bigger fish and were beaten by worthy opponents I know only thru the Interweb. Sloppy Seconds is never ideal but it had to be done as it was still a neat trip to make. The 4Gas had a spazz before we had broken a sweat and had to be shut down as it was blatantly lying about the 02 content and making a hell of a racket. This was far from ideal as there was a bunch of noxious primordial ooze right down there amongst that “Just for me and my dog” orange gloop and I wouldn’t be surprised if it was enough to get the h2s sensor squawking.

The trip involved walking through just over a mile of heavily flooded galleries and crosscuts, gingerly picking our way through a couple of truly unstable & massive roof collapses before we got to the payoff. Water was on average four feet deep with submerged roof collapses, random lumps of twisted, underwater, narrow gauge rail to negotiate and hidden sumps in the mine floor. Two of us had hilarious over wader moments, one resulting in blood loss and my waders sprang a leak within seconds of leaving the dry part of the mine. Other random weirdness was an anemic looking lizard 150ft from the surface amongst corn growing underground and being able to send SMS messages from the base of the shaft.

โ€œVenimus, Vidimus, Vicimusโ€

Next…!!!

Usual rules apply…No names, no locations, just pictures of somewhere very orange. Please don’t ask for locations as refusal often offends ๐Ÿ™‚

Harringworth Viaduct

We were out having a bit of a gander at some other stuff in the area so couldn’t really resist cracking off a few shots ofIndustrialVictoriana for you-Harringworth Viaduct.Built between March 1876 and July 1878 by 400 men and 120 horses using little more than hand tools this is an incredible feat of engineering that has to be seen to be believed.Some info ยฉ Copyright The Heritage Trail

It was during this period, between 1875 and 1879, that a remarkable feat of Victorian engineering was accomplished that is largely unknown or forgotten, except by those still living in its shadow. This was the construction of the East Midland Railway connecting line between Manton Junction and Glendon South Junction. Although covering a relatively short distance of just 16 miles, the work would involve the construction of 12 embankments, 16 cuttings, four tunnels and five viaducts. One of the five viaducts was to be something particularly special, and was known as the Harringworth Viaduct (nowadays, often referred to as the Welland or Seaton Viaduct). At a staggering length of 3,825ft (1,159m), it is still the longest structure of its type on Britain’s railway network.

 

The Harringworth Viaduct crosses the River Welland on the Rutland and Northamptonshire border, and is a grade II listed structure. It comprises 82 arches, each with a 42ft (12.7m) span. 71 of the supporting piers are 6ft (1.8m) thick, with a further 10 being double thickness and spaced evenly along its length. Each of these can be identified by a pilaster on its face and were designed to isolate the arches into ‘sets’, preventing any under-strain from being continued indefinitely from arch to arch. The average height of the arches is 57ft (17.2m), but the highest is 70ft (21.2m). The viaduct is constructed from some 30,000,000 bricks, all manufactured on site, with Derbyshire Gritstone springers, string courses and coping. As well as the bricks, construction required some 20,000 cubic yards of concrete, 19,000 cubic yards of stone, 37,543 cubic yards of lime mortar, and 5,876 cubic yards of cement.

Today, Harringworth Viaduct carries a double-track, non-electrified line and was used for freight traffic and occasional steam train excursions until February 2009. Since that date, East Midland Trains have introduced a service between Melton Mowbray and St Pancras, making it the first daily passenger service to use the viaduct since the 1960s.
These last two I couldn’t decide which one was my favourite so I’ve posted them both up…..one shot laying on the track and one standing, they both appeal to me in different ways….

Swithland Water Works

If Brick Arch Porn floats your boat then get ready for a nice fat slice…

The 5th July 1894 was the ceremony for the cutting of the first sod in the presence of 2-300 invited spectators and Swithland Reservoir and Water Works was completed two years later in 1896 to the designs of architects J B Everard and Everard and Pick.

Our sole interest on this visit however was the hexagonal Victorian underground reservoir underneath an elaborate octagonal stone gazebo. This sits on a large stone plinth and has 8 Doric Roman columns supporting arches, entablature and a lead dome with a carved stone lantern on top, surrounded by six further hexagonal Filter Beds which cleaned the water from the open reservoir before supplying the City of Leicester.

The sole purpose of the gazebo was that of an air vent for the underground reservoir and is typical of the over the top, detailed Victorian architecture found everywhere at these waterworks…Everywhere you look is red and blue brick, dressed stone and wrought iron!!

The hexagonal shaped underground reservoir is split into two sections which could be controlled independently by way of complex piping and Penstocks, both sides are a mirror image of each other and share the central airvent. This was quite a challenging location to light due to the structure and some ingress of daylight through the five small arched windows, hopefully I have done it justice…

The underground reservoir could be discharged out into the small river behind the waterworks by way of buried cast iron pipes leading to an ornate octagonal Excess Fountain built from blue brick and two small, stepped, overflow channels reached via a dressed stone bridge with carved Renaissance obelisks running over a granite lined stream. Also amongst the woods is a large pond with sluice gates.

The rest of the site is worthy of mention and might form part of a report on a return visit. There is an amazingly ornate Draw Off Tower at the edge of the open reservoir and some incredible brickwork arches forming part of the overflow and huge granite lined Spillway. Large cast iron pipes are visible all over the place and and we came across some beautiful Victorian Penstocks in the woods.

The original pump house is still intact but sadly today is full of modern electronics, previously it would have looked like this:

The entire site is now grade 2 listed and owned by Severn Trent water works.

Also running across the reservoir is the Great Central Railway and we saw several steam loco’s flying across the viaduct while we inserted and extracted from the site dodging the throngs of tourists.

In 1893, the Manchester, Sheffield and Lincolnshire Railway received the Royal Assent for the construction of the new mainline from Annesley, 12 miles north of Nottingham, to London Marylebone. The line opened for coal traffic in July 1898. The following March, the Great Central Railway ran its first passenger train from Marylebone Station, and soon lived up to its slogan, `Rapid Travel in Luxuryโ€™. However, the motor car began to have a serious effect on the railways in the 1950โ€™s and long stretches of the line were closed in 1966.

Today, the Great Central Railway is one of the few railways in the world where scheduled full size steam trains pass in motion on a double track. In 1969, a group of enthusiasts decided to recreate for future generations the magic and nostalgia of the great British age of steam. Eventually it is hoped to link Nottingham and Leicester.

Oops…FAIL…lighting in shot :-/
Gazebo air vent
NOT HDR…unedited shot!!

Wakerley Quarries – Partington Steel & Iron Co Ltd

A departure from the normal program of events but I do have a soft spot for Industrial Archaeology so I hope you enjoy….Bell Bros Ltd (1911-1915)
Wakerley Ironstone Co. Ltd (from 1915)
Partington Steel & Iron Co. Ltd (from 1918)
Discussions with Bell Broshad began in October 1907 with some trial holes but quarrying did not start until November 1911. A siding agreement withLNWR (London and North Western Railway) was dated July 1913. The quarries ran for a short while before the lease surrendered and was taken over byWakerley Ironstone Co. Ltd from 1915. Gravity was used to help the loaded tubs of Ironstone reach the tipping dock and two horses hauled the empty tubs back to the pits. For some reason the earlier tipping dock was abandoned and a new one built at the eastern end of theLNWR sidings, possibly because of an improved gradient to the railway.During the operation of the quarry a row of four Calcining Kilns were built by prisoners-of-war and next to them an engine room containing a horizontal boiler. It’s believed the kilns were never actually used and in fact only two of the four were ever completed.

From 1918 and now in the hands of Partington Steel & Iron Co. Ltd the quarry was extended the opposite side of the Harringworth Road and the tramway tunneled underneath. Around this time a second tipping dock was added to the newer eastern one and this is evident today as the original one is faced with stone and the new addition is red brick. The quarry became mechanised in later life making use of a Bucyrus Class 14 Steam Shovel and a Ruston Steam Transporter.

The quarry closed somewhere around 1921, the track was taken up and the bridge under the road filled in, everything else was left which is unusual as normal practice is to restore the ground at closure. Today both tipping docks are clearly visible, as is the deep cutting of the quarry. The railway sidings adjacent to the LNWR main line are also evident and there are some remains of the weighbridge at the top of the ‘new’ tipping dock.

Sadly the Engine Room has crumbled but all four calcining kilns dominate the landscape for miles around and are in remarkable condition.

Apologies for the gratuitous use of Sunstars but my Tokina glass has a 9 bladed diaphragm which makes 18 pointed Sunstars so I couldn’t resist it…

Calcining Kilns
‘New’ twin Tipping Dock – original in stone, later addition in red brick
The next shot shows the original Tipping Dock (running from left to right towards the kilns on the center horizon). The treeline to the right of the photo is the Main Railway line and the long raised area from the camera to the kilns is the LNWR sidings.

Another town another place, Another girl, another face.

The Black Pig was not available for deep water duty so Plan B or Plan C was in order. After some discussion we opted for Plan C.

Not been here for a while but there were a few things that required checking such as Chav/Moron impact and I’m sad to say that the Writers have been quite a way in which is sad. Someone who didn’t get quite as far used a ball of string to find their way before running out of string, graffing the nearest wall and leaving. If you are that dumb to employ tactics like this while exploring a mine then death must truly be stalking you. If you are reading this and want your ‘navigation device’ back its in my wheelie bin at home until Thursday (along with an entire carrier bag of crisp packets, beer cans & sweet wrappers…).

I wanted to get some shots from the farthest southerly points so all of the below are from this quite unusual looking area. Whilst shooting some of these shots we could all smell rotten eggs but nobody owned up to farting and my H2S alarm stayed silent (it’s only just back from calibration)…..curious!!

Usual rules apply…No names, no locations, just pictures of somewhere. Please don’t ask for locations as refusal often offends ๐Ÿ™‚

Photo’s are a bit rough I’m afraid, many taken hastily and should have been re-shot.

Final Destination

Mines #42 – Mmmmmm rich 02

Meteorological Perfection is not something you would normally associate with underground exploration but on our latest project a specific type of weather is the difference between rapid extraction, knackering 02 levels or a thoroughly enjoyable trip.

Weather Fronts were due to collide which meant a day of fantastic oxygen levels for us due to the high pressure and we enjoyed more than + 3% more 02 than had been experienced on many previous visits. Also in our favour were water levels so going chest deep got me to places I hadn’t previously been able to reach before without a boat.


Usual rules apply…No names, no locations, just pictures of somewhere. Please don’t ask for locations as refusal often offends ๐Ÿ™‚

May have been a tub…
Reflections
Random Elsan Chemical Toilet
Water level drops of over 2ft allowed me to finally get some shots of these steel arches. I would have gone through them but wandering around in 4ft of stinking, murky water,stumbling over rocks and hidden debris with $$$ camera gear makes me twitchy…
Totally submerged tripod shot from a few weeks ago…
Same shot, same depth, this week..progress!!
Boats in here for the next stage…

Watford ROC Group HQ No.5

Finally and as promised some Cold War content for you…Watford ROC Group HQ opened on 18th November 1961, finished operationally in 1968 and closed in 1973 before being sold in 1974. These days the site is owned by the Park Veterinary Centrewho’s surgery and offices are sited in theWW2 ROC buildings on the main road and use the bunker at the rear of the site for storage.Many original items have been stripped over the years but a vast amount of original features are still intact so it was well worth a visit.